Job Name__________________________________________________
Address____________________________________________________
City___________________________________State_____Zip_________
Job phone___________________Job fax_________________
Superintendent_________________________________
UNTIL THE
FOLLOWING GUIDELINES HAVE BEEN MET,
JOBSITE IS NOT READY FOR WOOD FLOOR INSTALLATION !
EXTERIOR CONDITIONS:
1 - GUTTERS AND DOWN SPOUTS ARE PROPERLY PLACED TO DRAIN WATER AWAY FROM
STRUCTURE: YES_____
2 - SOIL SURROUNDING THE STRUCTURE
IS PROPERLY GRADED TO DRAIN WATER AWAY FROM THE STRUCTURE: YES___
INTERIOR CONDITIONS:
1 - ALL WET TRADES ( DRYWALL, TILE, PAINT, PLASTER, ETC.) HAVE COMPLETED THERE
WORK: YES___
2 - HVAC (HEAT VENTILATION, AIR
CONDITIONING) ARE IN PLACE AND OPERATING(3-5 days prior to delivery of wood
floor products) PROPERLY: YES___
3 - THE BUILDING IS ENCLOSED AND
WEATHER TIGHT, INCLUDING ALL DOORS AND WINDOWS: YES___
4 - THE TEMPERATURE AND RELATIVE
HUMIDITY WITHIN THE STRUCTURE ARE AT "NORMAL LIVING CONDITIONS"
(TEMP- BETWEEN 60-80 DEGREES f AND RELATIVE HUMIDITY BETWEEN 30-50 PERCENT)
YES___
5 - SIX-MILL POLYETHYLENE
(PREFERABLY BLACK) HAS BEEN INSTALLED AND COVERS THE ENTIRE GROUND AREA IN THE
CRAWL SPACE: YES___
CONCRETE SLAB CONDITIONS
1 - VAPOR BARRIER HAS BEEN
INSTALLED UNDER SLAB: YES___
2 - CONCRETE HAS BEEN INSTALLED
FOR AT LEAST 30 DAYS: YES___
3 - IF WOOD FLOOR IS TO BE
INSTALLED OVER SLAB, IT IS FLAT AND TO SPECIFICATIONS: YES___
DELIVERY AND WORKING CONDITIONS:
(also see JOB CONDITIONS )
1 - DRIVEWAY AND SIDE WALKS ARE
INSTALLED: YES___
2 - PROPER ELECTRICAL POWER IS
AVAILABLE AND WITHIN 50 FEET OF USE: 120V___ 220V___
MOISTURE CONDITIONS: (See Water
& Wood pages)
1 - MOISTURE CONTENT OF THE WOOD
SUBFLOOR IS NO MORE THAN 4 PERCENTAGE POINTS ABOVE OR BELOW THE FINISH
FLOORING AND IS WITHIN REGIONAL MOISTURE CONTENT GUIDELINES. YES___
2 - MOISTURE TESTING OF CONCRETE
BEGAN NO SOONER THAN 30 DAYS AFTER THE SLAB WAS POURED. TEST RESULTS INDICATED
THAT IT IS SAFE FOR WOOD FLOORING INSTALLATION TO BEGIN, AND ALL READINGS HAVE
BEEN DOCUMENTED: YES___
WHAT TYPE OF TEST WAS USED
?____________________________
RESULTS:__________________________________________________
Weather condition: (temperature,
current conditions, ie: rainy, sunshine, freezing
etc.)__________________________________ ___________
Superintendent & company name
(print)_______________________________________________
I verify jobsite is ready for wood
flooring installation
signed____________________________________date___________
IT IS VERY
IMPORTANT THESE GUIDELINES ARE MET, AND FOLLOWED TO THE "T", IF NOT,
SOME ONE ( BUILDER, OWNER, WOOD FLOOR CONTRACTOR, or ALL) NEEDS TO SIGN OFF
THAT THESE ITEMS HAVE NOT BEEN FOLLOWED. THAT PERSON COULD ULTIMATELY TAKE
SOME IF NOT ALL RESPONSIBILITY IF THE JOB FAILS OR HAS PROBLEMS !